Description
Modernisation completed in 2019 to a high standard, worked along site a very well known consultancy who set the bar high in expectations and I’m proud to say we impressed and delivered a great design using leading industry equipment
Equipment
- Bespoke Lester control panel to integrated into original Thyssen design
- Dewhurst buttons
- Wittur doors – Hydra
- SafeLine auto dial unit
- Panachrome edges
- A3 Governor conversion
Lift Details
- Levels – 6
- Capacity – 8 person
- Programme – 8 weeks
- Consultant coordination
- Location – London